Eurofighter Typhoon



         



Eurofighter Typhoon

Description
RoleMulti-role fighter
Crew1 or 2
First FlightMarch 27 1994 (development aircraft)
Entered ServiceFebruary 14 2003
ManufacturerConsortium: EADS, BAE Systems, Alenia
Dimensions
Length15.96 m52 ft 5 in
Wingspan10.95 m35 ft 11 in
Height5.28 m17 ft 4 in
Wing Area50 m²540 ft²
Weights
Empty9,750 kg21,500 lb
Loaded15,550 kg34,280 lb
Maximum Takeoff21,000 kg46,300 lb
Capacity
Powerplant
Engines2 x Eurojet EJ200 turbofans
Dry thrust60 kN13,490 lb
Afterburner thrust90 kN20,220 lb
Performance
Maximum Speed2,390 km/h1,480 mph
Combat Range1,390 km860 miles
Ferry Range3,700 km2,300 miles
Service Ceiling> 18,000 m> 60,000 ft
Rate of Climb15,240 m/min50,000 ft/min
Wing Loading311 kg/m²63.7 lb/ft²
Thrust/Weight1.85 N/kg (empty)
Power/Mass kW/kg hp/lb
Avionics
AvionicsCAPTOR radar, "Pirate IRST" infrared sensor(FLIR)
Armament
Guns1 x 27 mm Mauser BK-27 cannon
BombsPaveway 2, Paveway 3, Enhanced Paveway, JDAM
MissilesAGM-84 Harpoon, AGM-88 HARM, AIM-9 Sidewinder, AIM-132 ASRAAM, AIM-120 AMRAAM, IRIS-T, MBDA Meteor, ALARMs, Storm Shadow(AKA "Scalp EG"), Brimstone, Taurus, Penguin
Rockets
OtherLaser designator, e.g. TIALD pod


The Eurofighter Typhoon is a twin-engine multi-role canard-delta fighter aircraft, very similar to the American Rockwell-MBB X-31 prototype and designed and built by a consortium of European nations formed in 1983.

[Top]

History

The initial members were the United Kingdom, France, Germany, Italy, and Spain. In 1985 France withdrew in favour of its own Avions de Combat Expérimentaux (ACX) project (which later became the Dassault Rafale).

Initial hardware requirements were as follows: UK 250, Germany 250, Italy 165, and Spain 100. Production work share was divided among the countries proportionally to procurement: British Aerospace (33%), Daimler-Benz (33%), Aeritalia (21%), and Spain's CASA (13%).

Over the next five years, design work continued, aided by data from the British Aerospace EAP prototype which had first flown in August, 1986. The maiden flight of the Typhoon prototype took place on March 27,1994 (then just known as the Eurofighter EF 2000). Messerschmitt-Bölkow-Blohm chief test pilot Peter Weger took the prototype on a test flight around Bavaria. The 1990s saw significant arguments over work share, the specification of the aircraft and even participation in the project.

When the final production contract was signed, revised procurement totals were as follows: UK 232, Germany 180, Italy 121, and Spain 87. Production was again allotted according to procurement: British Aerospace (37%), DASA (29%), Aeritalia (19.5%), and CASA (14%).

Development is now the responsibility of Eurofighter Jagdflugzeug GmbH, based in Munich and wholly owned by BAE SYSTEMS (formerly British Aerospace) in the UK, Alenia Aerospazio in Italy, and the EADS Deutschland Aerospace Group (formerly DaimlerChrysler, in conjunction with Deutsche Aerospace AG) and EADS Spain (formerly CASA).

On July 2, 2002 the Austrian government announced the decision to buy the Typhoon as its new air defence aircraft. The contract was not signed at that time, however, due to floods, an election, and political controversy. The purchase of 18 Typhoons was finalized on July 1, 2003. The cost was €1,959,000,000 and included 18 aircraft, training for pilots and ground crew, logistics, maintenance, and a simulator. The full, "fly-away" price of a single Typhoon works out to €62,900,000

The project has been named and renamed a number of times since its inception, having been known as EFA (European Fighter Aircraft), Eurofighter, EF2000 (Eurofighter 2000), and most recently Typhoon.

[Top]

Production

The Eurofighter Typhoon is unique in modern combat aircraft in that there are four separate assembly lines (the F-16 was only produced internationally under limited licences). Each partner company assembles its own national aircraft, but builds the same parts of all 620 aircraft.

Production is divided into three "tranches" (see table below) with an incremental increase in capability with each tranche. Tranches are further divided up into batches, for example of the RAF's Tranche one twin seaters T1s are batch 1 and T1As are batch 2.


Production summary
  Tranche 1 Tranche 2 Tranche 3 TOTAL
Germany 44 68 68 180
Italy 29 46 46 121
Spain 20 33 34 87
UK 55 89 88 232
TOTAL 148 236 236 620


[Top]

Inventory

Despite many delays and controversies over cost, the Typhoon is now in series production.

In British service, the aircraft is supposed to replace the Tornado F3 and the Jaguar GR3A.

The Tornados will be replaced from 2006-2010, and the Jaguars from 2010-2014. Initial deliveries of the Typhoon to the RAF have begun. The first unit to form was an Operational Evaluation Unit, No. 17 Sqn in 2003 followed by the Operational Conversion Unit, 29 Sqn at BAE Warton in 2004. The aircraft are expected to move to RAF Coningsby in 2005. The initial designations for the RAF aircraft are T1 for the two seater trainer, and F2 for the single seater operational fighter.

An extensive overseas sales effort has so far yielded an order from Greece for 60 aircraft, and an order from Austria for 18 units. Norway has also expressed interest, but has yet to buy any Eurofighters. Other countries expressing interest include South Africa, Chile, Brazil, Saudi Arabia and Turkey.

The Typhoon could possibly meet the requirements of the UK's Future Offensive Air System programme which is seeking to replace the deep-strike capability provided by the Tornado GR4. If selected the Typhoon would likely be modified for internal weapons carriage and increased internal fuel capacity.

[Top]

Combat Performance


The German Chancellor with a
new Luftwaffe Eurofighter

For a detailed comparison of the Typhoon and other fighters see: Comparison of 2000s fighter aircraft.

The Typhoon's combat performance, particularly compared to the upcoming F/A-22 Raptor and F-35 fighters under development in the United States and the Dassault Rafale developed in France, has been the subject of some speculation. While making a complete assessment is impossible on publicly available information, there is a study by DERA comparing the Typhoon with other contemporary fighters.

Whilst the Typhoon lacks the all-aspect stealth technology of the F/A-22, the design does incorporate many low-observable features resulting in a much smaller radar cross-section than earlier fighters. It is also capable of sustained supersonic cruise without using afterburners the only fighter other than the F-22 capable of it.

According to EADS, the maximum speed possible without reheat is Mach 1.5 (although this drops to Mach 1.3 with an air-to-air weapons load).

[Top]

Problems

As German newspapers reported in 2004, the few Eurofighters in service with the Luftwaffe did not meet specifications at that time. Due to technical difficulties, the aircraft are only allowed to take off without cannon ammunition and at moderate temperatures. However it is important to note that early aircraft are delivered at a baseline state with capability to be increased incrementally, indeed BAE has stated that the capability of the aircraft will increase at a faster rate than the training of pilots.

[Top]

Versions

[Top]

Characteristics

[Top]

Development timeline

[Top]

Pictures



[Top]

References

[Top]

See also

[Top]




  View Live Article   This article is from Wikipedia. All text is available under the terms of the GNU Free Documentation License